In a timber mill, cylindrical logs arrive as input and are cut into smaller cylindrical pieces of the same radius using manual and mechanized saws.
Manual saw: requires 4 workers, takes 2 hours to cut a log into 2 pieces.
Mechanized saw: requires 2 workers, takes 1 hour to cut the same log into 2 pieces.
Time to cut is proportional to the cross-sectional area.
If 12 workers must cut 60 logs into 4 equal pieces each, using 2 mechanized saws and 2 manual saws, find the total time required.