An oil company required 12000, 20000 and 15000 barrels of high-grade, medium grade and low grade oil, respectively. Refinery A produces 100, 300 and 200 barrels per day of high-grade, medium-grade and low-grade oil, respectively, while refinery B produces 200, 400 and 100 barrels per day of high-grade, medium-grade and low-grade oil, respectively. If refinery A costs ? 400 per day and refinery B costs ? 300 per day to operate, then the days should each be run to minimize costs while satisfying requirements are