A building is constructed on a plot measuring 70 m × 40 m. The utilized FAR of the building is 1.5. An energy audit team found that the average monthly electricity bill of the building is INR 2,94,000. The unit cost of the electricity is INR 7. The Building Energy Index is \(\underline{\hspace{1cm}}\) kW-hr/m\(^2\)/year (in integer).
GATE AR - 2021
GATE AR
Building Services and Sustainability
Building Performance Simulation and Evaluation
As per the Solid Waste Management Rules 2016, which among the following are 'Duties of waste generators'?
GATE AR - 2021
GATE AR
Services and Infrastructure
Solid waste management: Methods
Choose the correct options with regard to activated sludge process.
GATE AR - 2021
GATE AR
Services and Infrastructure
Sewage disposal methods
A rectangular hall with dimensions 8.0 m × 14.0 m × 4.0 m has 4 windows (1.5 m × 1.0 m each) and 2 doors (1.0 m × 2.0 m each). The coefficients of absorption are given below. Considering all windows open and doors closed, the reverberation time in seconds is \(\underline{\hspace{2cm}}\).
GATE AR - 2021
GATE AR
Building Services and Sustainability
Thermal, visual and acoustic comfort in built environments
Given: Surface conductance = 20 W/m²°C, U-value of the wall = 1.2 W/m²°C, and solar gain factor = 0.66. Find the solar gain factor for a wall.
GATE AR - 2021
GATE AR
Building Services and Sustainability
Solar architecture
Which of the following international treaties are related to Climate Change and global warming?
GATE AR - 2021
GATE AR
Environmental Planning and Design
Climate change and built environment
Which of the following algorithms are used for finding the shortest path in an urban transportation network?
GATE AR - 2021
GATE AR
Infrastructure Planning
Traffic analyses and design considerations
Which of the following statements are true with respect to surface paint?
GATE AR - 2021
GATE AR
Building Construction and Structural systems
Building material characteristics and applications
Choose the correct options with respect to cycle track design as per Indian Road Congress guidelines.
GATE AR - 2021
GATE AR
Services and Infrastructure
Pedestrian and slow moving traffic planning
As per the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013, for which purposes can the urgency clause for land acquisition be invoked?
GATE AR - 2021
GATE AR
Planning Techniques and Management
Planning Legislation and implementation – Land Acquisition Act, PPP etc.
Freight flows are converted to truck flows using
GATE AR - 2021
GATE AR
Infrastructure Planning
Road capacity and Travel demand forecasting
Rebound hammer test is used to measure
GATE AR - 2021
GATE AR
Building Construction and Structural systems
Building material characteristics and applications
Which type of temporary supporting structure can be used in case of rebuilding the lower part of a load bearing wall at ground floor above plinth level?
GATE AR - 2021
GATE AR
Construction and Management
Temporary structures for rehabilitation
During earthquake, soft storey failure in a building is due to
GATE AR - 2021
GATE AR
Construction and Management
Principles and design of disaster resistant structures
An urban governance tool to mobilize financial resources by permitting additional FAR over and above the prescribed FAR by imposing a charge or fee for the same is known as
GATE AR - 2021
GATE AR
Planning Techniques and Management
Urban Economics
Identify the colour palette that is created using any three equally spaced hues around the colour wheel.
GATE AR - 2021
GATE AR
Architecture, Planning and Design
Visual composition in 2D and 3D
Coefficient of Performance (COP) for heat pump is used to calculate
GATE AR - 2021
GATE AR
Building Services and Sustainability
Air-Conditioning systems
The curve traced by a point on a circle rolling inside another circle is known as
GATE AR - 2021
GATE AR
Architecture, Planning and Design
Architectural Graphics
The law of Primate City was first proposed by
GATE AR - 2021
GATE AR
Regional and Settlement Planning
Regional delineation
In the European Union which constitutes the cities namely, London, Paris, Brussels, Amsterdam, Cologne, Frankfurt, Munich and Milan, lie within a linear megalopolitan zone known as
GATE AR - 2021
GATE AR
Regional and Settlement Planning
Regional delineation
The total head or total lift against which a pump works includes suction lift, discharge lift and
GATE AR - 2021
GATE AR
Services and Infrastructure
Water supply and distribution system
The two components for measuring time of concentration for storm water are:
GATE AR - 2021
GATE AR
Services and Infrastructure
Storm water drainage system: Principles, Planning, Design
The traffic assignment technique where the traffic arranges itself in congested networks such that the journey time in all used routes between an Origin-Destination pair are equal and less than those that would be experienced in all unused routes. This is known as
GATE AR - 2021
GATE AR
Infrastructure Planning
Traffic analyses and design considerations
What is the dependent variable in a regression based trip generation model?
GATE AR - 2021
GATE AR
Infrastructure Planning
Process and Principles of Transportation Planning and Traffic Engineering
A wastewater pipe connecting two inspection chambers (IC) is laid at a slope of 1:200. The Invert Level of the starting IC is -450 mm. The Invert level of the second pit at a distance of 40 m from the first IC is
GATE AR - 2021
GATE AR
Services and Infrastructure
Sewage disposal methods