A steel workpiece is to be milled. Metal removal rate is 30 cm3/min. Depth of cut is 5 mm and width of cut is 100 mm. The rate of feed in mm/min is}
Consider the network diagram shown in Figure. The time estimates in days along the arrows represents the activities. The project completion time in days based on critical path is