>
Andhra Pradesh Post Graduate Engineering Common Entrance Test
List of top Questions asked in Andhra Pradesh Post Graduate Engineering Common Entrance Test
The characteristic equation of a system is given by,
\[ s^5 + 10s^3 + 5s^2 + 2 = 0 \]
This system is:
AP PGECET - 2024
AP PGECET
Electrical Engineering
Stability Analysis
Consider the following statements:
A system is said to be stable if its output is bounded for any input.
A system is stable if all the roots of the characteristic equation lie in the right half of the s-plane.
A system is stable if all the roots of the characteristic equation have negative real parts.
A second order system is always stable for finite positive values of open loop gain.
Which of the above statements are correct?
AP PGECET - 2024
AP PGECET
Electrical Engineering
Stability Analysis
The Servo motor differs from standard motor principally in that, it has:
AP PGECET - 2024
AP PGECET
Electrical Engineering
Electrical Machines
Which of the following types of faults does a bus differential relay NOT effectively detect?
AP PGECET - 2024
AP PGECET
Electrical Engineering
Power System Stability
Consider a feedback system with gain margin of about 30. At what point does the Nyquist plot cross the negative real axis?
AP PGECET - 2024
AP PGECET
Electrical Engineering
Nyquist Criterion
In a 220kV system, the inductance and capacitance up to the circuit breaker location are 25 mH and 0.025 micro Farads. The value of the resistor required to be connected across the breaker contacts which will give no transient oscillations is:
AP PGECET - 2024
AP PGECET
Electrical Engineering
Power System Stability
In a bode magnitude plot, which one of the following slopes would be exhibited at high frequencies by a 4th order all-pole system?
AP PGECET - 2024
AP PGECET
Electrical Engineering
Bode Plot
In a multi-machine interconnected power system, subsequent to a 3-phase fault, the transient stability is examined by:
AP PGECET - 2024
AP PGECET
Electrical Engineering
Power System Stability
The Y-bus matrix of a 100-bus interconnected system is 90% sparse. Hence the number of transmission lines in the system must be:
AP PGECET - 2024
AP PGECET
Electrical Engineering
Power System Stability
An alternator having an induced emf of 1.6 p.u. is connected to an infinite bus of 1 p.u. If the busbar has reactance of 0.6 p.u. and alternator has reactance of 0.2 p.u., what is the maximum power that can be transferred?
AP PGECET - 2024
AP PGECET
Electrical Engineering
Electrical power
Which of the following circuit breakers take minimum time in installation?
AP PGECET - 2024
AP PGECET
Electrical Engineering
Electrical power
For a given power system, its zero and maximum regulation will occur at the impedance angle of:
AP PGECET - 2024
AP PGECET
Electrical Engineering
Power System Stability
A protection system engineer is planning to provide complete protection for a 3-phase transmission line. He can achieve this by:
AP PGECET - 2024
AP PGECET
Electrical Engineering
Power System Stability
Which of the following is not a requirement for site selection of a hydroelectric power plant?
AP PGECET - 2024
AP PGECET
Electrical Engineering
Power System Stability
Efficient Line-Commutated Converter (LCC) HVDC converters generally use:
AP PGECET - 2024
AP PGECET
Electrical Engineering
Power System Stability
Fault calculations using computer programs are usually done by:
AP PGECET - 2024
AP PGECET
Electrical Engineering
Fault Analysis
Which component of gas turbine power plant is the main cause of its low efficiency?
AP PGECET - 2024
AP PGECET
Electrical Engineering
Power System Stability
If all the sequence voltages at the fault point in a power system are equal, then the fault is:
AP PGECET - 2024
AP PGECET
Electrical Engineering
Fault Analysis
A 100 kVA Generator has 10% reactance. Its short circuit kVA is:
AP PGECET - 2024
AP PGECET
Electrical Engineering
Generator Parameters
The incremental cost characteristics of two generators delivering a total load of 200 MW are as follows:
\[ C_1 = 4.01 + 0.1P_1 \, \text{Rs/MWh} \quad \text{and} \quad C_2 = 1.60 + 0.2P_2 \, \text{Rs/MWh} \]
What should be the values of \(P_1\) and \(P_2\) for economic operation?
AP PGECET - 2024
AP PGECET
Electrical Engineering
Power System Stability
The magnitude of zero sequence current of a generator for LG fault is 2.4 p.u. The current through the neutral during fault in p.u. is:
AP PGECET - 2024
AP PGECET
Electrical Engineering
Fault Analysis
The main objective of Load Frequency controller is to apply control of:
AP PGECET - 2024
AP PGECET
Electrical Engineering
Power System Stability
Two insulator discs of identical capacitance value C make up a string for a 22kV, 50Hz, single-phase transmission line. If the pin-to-earth capacitance is also C, then the string efficiency is:
AP PGECET - 2024
AP PGECET
Electrical Engineering
Transmission Lines
Starting torque in the case of a 3-phase synchronous motor is:
AP PGECET - 2024
AP PGECET
Electrical Engineering
Synchronous Motors
Breakdown torque in a 3-phase induction motor of negligible stator impedance is:
AP PGECET - 2024
AP PGECET
Electrical Engineering
Induction Motor
Prev
1
...
84
85
86
87
88
...
97
Next