TS PGECET
>
Geo Engineering and Geo Informatics
List of top Geo Engineering and Geo Informatics Questions asked in TS PGECET
It is convenient to record the field notes for a closed traverse in the field book:
TS PGECET - 2024
TS PGECET
Geo Engineering and Geo Informatics
Surveying and Geo-informatics Methods
If the altitude bubble is provided both on the index frame as well as on the telescope of a theodolite, then the instrument is levelled with reference to the:
TS PGECET - 2024
TS PGECET
Geo Engineering and Geo Informatics
Surveying and Geo-informatics Methods
The height of the instrument is equal to:
TS PGECET - 2024
TS PGECET
Geo Engineering and Geo Informatics
Surveying and Geo-informatics Methods
Surveys which are carried out to provide a national grid of control for preparation of accurate maps of large areas are known as:
TS PGECET - 2024
TS PGECET
Geo Engineering and Geo Informatics
Surveying and Geo-informatics Methods
The temporary adjustments of surveyor compass involve:
TS PGECET - 2024
TS PGECET
Geo Engineering and Geo Informatics
Surveying and Geo-informatics Methods
With regard to the theodolite, which one of the following statements is correct?
TS PGECET - 2024
TS PGECET
Geo Engineering and Geo Informatics
Surveying and Geo-informatics Methods
If \( n \) is the number of sides of a traverse, the theoretical sum of the interior included angles of a closed traverse is:
TS PGECET - 2024
TS PGECET
Geo Engineering and Geo Informatics
Surveying and Geo-informatics Methods
Overturning of vehicles on a curve can be avoided by using a:
TS PGECET - 2024
TS PGECET
Geo Engineering and Geo Informatics
Surveying and Geo-informatics Methods
The curve which deflects to the right of the direction of the progress of survey is called as:
TS PGECET - 2024
TS PGECET
Geo Engineering and Geo Informatics
Surveying and Geo-informatics Methods
Transition curves are introduced at each end of a circular curve to obtain:
TS PGECET - 2024
TS PGECET
Geo Engineering and Geo Informatics
Surveying and Geo-informatics Methods
Perpendicular offset from the junction of a transition curve and circular curve to the tangent is equal to:
TS PGECET - 2024
TS PGECET
Geo Engineering and Geo Informatics
Surveying and Geo-informatics Methods
In an external focusing telescope, the focusing of the objective is achieved by:
TS PGECET - 2024
TS PGECET
Geo Engineering and Geo Informatics
Surveying and Geo-informatics Methods
Which of the following options is the correct one as per the principle of barometric levelling?
TS PGECET - 2024
TS PGECET
Geo Engineering and Geo Informatics
Surveying and Geo-informatics Methods
In reciprocal levelling, the error which is not completely eliminated is due to
TS PGECET - 2024
TS PGECET
Geo Engineering and Geo Informatics
Surveying and Geo-informatics Methods
If the intercept on a vertical staff is observed as 0.5 m from a tacheometer, the horizontal distance between the tacheometer and the staff station is (assume K = 100, C = 0):
TS PGECET - 2024
TS PGECET
Geo Engineering and Geo Informatics
Surveying and Geo-informatics Methods
Mathematical check for the computation of R.L. by rise and fall method is given by
TS PGECET - 2024
TS PGECET
Geo Engineering and Geo Informatics
Surveying and Geo-informatics Methods
The wavelengths used in various electronic distance measurement systems cover fairly the spectrum of range
TS PGECET - 2024
TS PGECET
Geo Engineering and Geo Informatics
Surveying and Geo-informatics Methods
The smallest length that can be drawn on a map is:
TS PGECET - 2024
TS PGECET
Geo Engineering and Geo Informatics
Surveying and Geo-informatics Methods
After subjecting the EDM systems to the meteorological corrections, the possible accuracy range expected in short range and long range EDM systems respectively is
TS PGECET - 2024
TS PGECET
Geo Engineering and Geo Informatics
Surveying and Geo-informatics Methods
Which of the following proprietary raster formats does ESRI use in its software products such as ArcInfo and ArcView GIS?
TS PGECET - 2024
TS PGECET
Geo Engineering and Geo Informatics
Surveying and Geo-informatics Methods
Which of the following data format for ArcView GIS defines the geometry and attribute of geographically referenced objects by three specific files—main file, index file, and a database table?
TS PGECET - 2024
TS PGECET
Geo Engineering and Geo Informatics
Surveying and Geo-informatics Methods
The principle of working from whole to part is used in surveying because:
TS PGECET - 2024
TS PGECET
Geo Engineering and Geo Informatics
Surveying and Geo-informatics Methods
In GIS, the stored information—either spatial data or associated tabular data—can be retrieved with the help of a language called:
TS PGECET - 2024
TS PGECET
Geo Engineering and Geo Informatics
Surveying and Geo-informatics Methods
Those areas of the frequency spectrum which are not severely influenced by atmospheric absorption and thus are extremely useful to remote sensors are called:
TS PGECET - 2024
TS PGECET
Geo Engineering and Geo Informatics
Surveying and Geo-informatics Methods
The ratio of the total stream length cumulated for all orders in the basin to the total area of the basin is called as:
TS PGECET - 2024
TS PGECET
Geo Engineering and Geo Informatics
Study of Rain Fall
Prev
1
2
3
...
5
Next