Which of the following sentences are correct as per the uses of flow-duration curves are concerned? (i) determining dependable flow which information is required for planning of water resources and hydro power projects (ii) designing a drainage system (iii) flood control studies
Show Hint
Flow-duration curves are an essential tool for hydraulic engineers to predict flow behaviors over time for multiple applications.
Flow-duration curves are useful for all three tasks listed: (i) determining dependable flow for water resources planning and hydropower projects, (ii) designing drainage systems, and (iii) conducting flood control studies.