Volume of cuboidal reservoir = 108 m3 = (\(108 × 1000\)) L = 108000 L
It is given that water is being poured at the rate of 60 L per minute.
That is, (\(60 × 60\)) L = 3600 L per hour
Required number of hours = \(\frac{108000}{3600} = 30\) hours
Thus, it will take 30 hours to fill the reservoir.