Question:

Details of activities of a project are given as 

The time required, in days, to complete the project along the critical path is (in integer).

Show Hint

The critical path determines the shortest time to complete a project. If any activity on the critical path is delayed, the entire project is delayed.
Updated On: Sep 4, 2025
Hide Solution
collegedunia
Verified By Collegedunia

Solution and Explanation

- The critical path method is used to determine the longest path through the project network, which defines the minimum time required to complete the project.
- By calculating the total duration of each path from the start to the end, we identify the critical path as the one with the maximum total duration.
- After analyzing the network of activities and dependencies, the critical path for the given project involves the activities with durations totaling 43 days.