>
TS PGECET
List of top Questions asked in TS PGECET
Wrought iron contains carbon up to
TS PGECET - 2024
TS PGECET
Civil Engineering
Construction Materials
The angle between the direction of star and the direction of earth's axis of rotation is called as
TS PGECET - 2024
TS PGECET
Civil Engineering
Photogrammetry
Fixed delay does not depend on which of the following factor?
TS PGECET - 2024
TS PGECET
Civil Engineering
Traffic Engineering
What is the most commonly used overlay?
TS PGECET - 2024
TS PGECET
Civil Engineering
Highway Engineering
The biochemical oxygen demand is computed by
TS PGECET - 2024
TS PGECET
Civil Engineering
Water Resources
Economic height of a dam is the height corresponding to which
TS PGECET - 2024
TS PGECET
Civil Engineering
Water Resources
Turbidity of raw water is a measure of
TS PGECET - 2024
TS PGECET
Civil Engineering
Water Resources
A crop requires 1000 mm of water for a base period of 100 days. The duty of water in hectares per cumec is
TS PGECET - 2024
TS PGECET
Civil Engineering
Hydrology
Which of the following is not a common use of unit hydrographs?
TS PGECET - 2024
TS PGECET
Civil Engineering
Irrigation
Bishop's simplified method of slices satisfies
TS PGECET - 2024
TS PGECET
Civil Engineering
Fluid Mechanics
The negative skin friction on a pile develops when
TS PGECET - 2024
TS PGECET
Civil Engineering
Foundation Engineering
The orthogonal projection of the perspective centre on a tilted photograph is called as
TS PGECET - 2024
TS PGECET
Civil Engineering
Photogrammetry
The point where vertical line passing through the perspective centre intersects the plane of the photograph, is known as
TS PGECET - 2024
TS PGECET
Civil Engineering
Principles of surveying
The least count of a self-reading levelling staff is
TS PGECET - 2024
TS PGECET
Civil Engineering
Principles of surveying
Profile leveling is usually done for determining
TS PGECET - 2024
TS PGECET
Civil Engineering
Principles of surveying
Which of the following is not the characteristic of contours?
TS PGECET - 2024
TS PGECET
Civil Engineering
Photogrammetry
If $\theta$ and $\delta$ be the latitude of an observer and declination of a heavenly body respectively, the upper culmination of the body will be south of zenith, if its zenith distance is
TS PGECET - 2024
TS PGECET
Civil Engineering
Photogrammetry
Which of the following is not an application of travel time and delay study?
TS PGECET - 2024
TS PGECET
Civil Engineering
Traffic Engineering
What is the primary factor affecting the capacity of urban roads during peak hours?
TS PGECET - 2024
TS PGECET
Civil Engineering
Traffic Engineering
The enoscope is used to determine
TS PGECET - 2024
TS PGECET
Civil Engineering
Traffic Engineering
Which traffic sign is represented by a rectangular shape with a red border and a black diagonal line?
TS PGECET - 2024
TS PGECET
Civil Engineering
Principles of surveying
When distances are small, which of the following error is negligible in surveying?
TS PGECET - 2024
TS PGECET
Civil Engineering
Principles of surveying
A 50 m tape is held 2 m out of line, then its true length is:
TS PGECET - 2024
TS PGECET
Civil Engineering
Principles of surveying
The best direction of a runway is along the direction of
TS PGECET - 2024
TS PGECET
Civil Engineering
Highway Engineering
Which of the below is not a type of force acting on the cement concrete pavement?
TS PGECET - 2024
TS PGECET
Civil Engineering
Highway Engineering
Prev
1
...
56
57
58
59
60
...
95
Next