| Feature in mine plan | Symbol | ||
| P | shaft | 1 | ![]() |
| Q | staple shaft | 2 | ![]() |
| R | Abandoned shaft | 3 | ![]() |
| S | Abandoned staple shaft | 4 | ![]() |
Reciprocal levelling is performed for points P and Q by placing the same levelling instrument at A and B. The observations of staff readings are tabulated as below. 
If the Reduced Level (RL) of P is 115.246 m, then the true RL of Q, in m, is _______ (rounded off to 3 decimal places)
The information of a mining project for a life of three years is given below:
Additional data: Applicable tax rate = 30%
Discount rate = 10%
Depreciation method: Straight line with zero salvage value
Data from a borehole log with collar elevation at 590 mRL are given below. Composite grade is calculated using cores of 5 m above and below the reference bench at 580 mRL. The composite grade, in %, is: