If the value of the double integral
\(\displaystyle\int^{4}_{x=3}\displaystyle\int^{2}_{y=1}\frac{dydx}{(x+y)^2}\)
is
\(\log e (\frac{a}{24})\)
, then a is ____ (answer in integer).
GATE Metallurgy - 2024
GATE Metallurgy
Updated On:
Jan 23, 2025
Hide Solution
Verified By Collegedunia
Correct Answer:
25
Solution and Explanation
The correct answer is:25 to 25
Download Solution in PDF
Was this answer helpful?
0
5
Top Questions on Integration by trapezoidal and Simpson’s rules
If the trapezoidal rule with a single interval [0, 1] is exact for the approximate value of \( \int_0^1 (x^3 - cx^2) \, dx \). Then the value of \( c \).
AP PGECET - 2024
Engineering Mathematics
Integration by trapezoidal and Simpson’s rules
View Solution
View All
Questions Asked in GATE Metallurgy exam
Let f(z) be an analytic function, where z = x + iy. If the real part of f(z) is cosh x cos y, and the imaginary part of f(z) is zero for y = 0, then f(z) is
GATE Metallurgy - 2024
Analytic functions
View Solution
Steady, compressible flow of air takes place through an adiabatic converging- diverging nozzle, as shown in the figure. For a particular value of pressure difference across the nozzle, a stationary normal shock wave forms in the diverging section of the nozzle. If E and F denote the flow conditions just upstream and downstream of the normal shock, respectively, which of the following statement(s) is/are TRUE?
GATE Metallurgy - 2024
Basics of compressible fluid flow
View Solution
In an arc welding process, the voltage and current are 30V and 200A, respectively. The cross-sectional area of the joint is 20 mm
2
and the welding speed is 5mm/s. The heat required to melt the material is 20 J/s. The percentage of heat lost to the surrounding during the welding process is ____(rounded off to 2 decimal places).
GATE Metallurgy - 2024
Principles of welding, brazing, soldering and adhesive bonding
View Solution
A set of jobs U, V, W, X, Y, Z arrive at time t = 0 to a production line consisting of two workstations in series. Each job must be processed by both workstations in sequence (i.e., the first followed by the second). The process times (in minutes) for each job on each workstation in the production line are given below.
Job
U
V
W
X
Y
Z
Workstation 1
5
7
3
4
6
8
Workstation 2
4
6
6
8
5
7
The sequence in which the jobs must be processed by the production line if the total makespan of production is to be minimized is
GATE Metallurgy - 2024
Principles of non-traditional machining processes
View Solution
A ram in the form of a rectangular body of size l=9m and b=2m is suspended by two parallel ropes of lengths 7m. Assume the center-of-mass of the body is at its geometric center and g = 9.81m/s
2
. For striking the object P with a horizontal velocity of 5m/s, what is the angle θ with the vertical from which the ram should be released from rest?
GATE Metallurgy - 2024
Forces on submerged bodies
View Solution
View More Questions