A project network with the sequence of five activities is shown.
A project network with the sequence of five activities
The crashing costs of activities are
ActivityABCDE
Duration (week) 56834
Crashing cost per week (lakh INR)4.02.52.03.04.0
If the project is crashed by one week, the increase in project cost, in lakh INR, is
  • GATE MN - 2024
  • GATE MN
  • Systems Engineering
  • Network Analysis
For a geared engine winding system, the man winding cage is placed at its normal position at pit top of the shaft. As per CMR 2017, the minimum space, in m, between the center of the hole of the detaching hook attached to the rope shackle and detaching belt plate is