Question:

A set of jobs U, V, W, X, Y, Z arrive at time t = 0 to a production line consisting of two workstations in series. Each job must be processed by both workstations in sequence (i.e., the first followed by the second). The process times (in minutes) for each job on each workstation in the production line are given below.
JobUVWXYZ
Workstation 1573468
Workstation 2466857

The sequence in which the jobs must be processed by the production line if the total makespan of production is to be minimized is

  • W-X-Z-V-Y-U
  • W-X-V-Z-Y-U
  • W-U-Z-V-Y-X
  • U-Y-V-Z-X-W
Hide Solution
collegedunia
Verified By Collegedunia

The Correct Option is A

Solution and Explanation

The correct option is (A): W-X-Z-V-Y-U
Was this answer helpful?