A construction project consists of four activities. The duration, relationship, and cost parameters are given in the table. The indirect cost of the project is INR 5000 per week. If the project has to be completed by 12 weeks, the total project cost will be, INR _________ (Answer in integer)
Match the items in Group-I with the corresponding statements in Group-II.
Match the statements in Group-I with the corresponding names of architects in Group-II.
A four-arm uncontrolled un-signaled urban intersection of both-way traffic is illustrated in the figure. Vehicles approaching the intersection from the directions A, B, C, and D can move to either left, right, or continue in straight direction. No U-turn is allowed. In the given situation, the maximum number of vehicular crossing conflict points for this intersection is _________ (answer in integer)
An individual chooses a transport mode for a particular trip based on three attributes i.e., cost of journey (X), In-vehicle travel time to reach destination (Y), and Out-of-vehicle time taken to access mode at respective stops (Z). The values for these attributes for three modes Rail, Bus and Para-transit are given in the table. If the general utility (U) equation is \( U = - 0.5 \times X - 0.3 \times Y - 0.4 \times Z \), using the Logit model, the estimated probability of choosing Bus is _________ (rounded off to two decimal places).