List of top Industrial Engineering Questions asked in CUET (PG)

Which one of the following divisions is not part of aggregate production planning?
  • CUET (PG) - 2023
  • CUET (PG)
  • Industrial Engineering
  • Aggregate Production Planning and Scheduling
A set of 5 jobs is to be planned on a single machine. The processing time (in days) is given in the table below. The holding cost for each job is Rs.2 per day.
JobProcessing Time
P5
Q2
R2
S2
T1
Schedule that minimizes total inventory cost is:
  • CUET (PG) - 2023
  • CUET (PG)
  • Industrial Engineering
  • Production Planning and Inventory Control