Question:

Which major Indian infrastructure project, featuring the world's highest railway arch bridge over the Chenab River, was fully integrated into the national network in 2025?

Show Hint

For infrastructure-related questions, focus on key details like the specific structures or features that distinguish the project.
Updated On: Jan 7, 2026
  • Bharatmala Project
  • USBRL (Udhampur-Srinagar-Baramulla Rail Link)
  • Diamond Quadrilateral
  • Char Dham Highway Project
  • Namo Bharat RRTS (Regional Rapid Transit System)
Hide Solution
collegedunia
Verified By Collegedunia

The Correct Option is

Solution and Explanation

Step 1: Understanding the question.
The question asks about a major Indian infrastructure project that was integrated into the national network in 2025, with a specific focus on the world’s highest railway arch bridge over the Chenab River.
Step 2: Analyzing the options.
(A) Bharatmala Project: Incorrect. Although the Bharatmala project is a significant infrastructure initiative, it is not specifically linked to the bridge over the Chenab River.
(B) USBRL (Udhampur-Srinagar-Baramulla Rail Link): Incorrect. While USBRL is a key project, it is not the one fully integrated in 2025.
(C) Diamond Quadrilateral: Incorrect. The Diamond Quadrilateral is a proposed rail network, not the project in question.
(D) Char Dham Highway Project: Incorrect. The Char Dham project is not related to the Chenab River bridge.
(E) Namo Bharat RRTS: Correct — The Namo Bharat RRTS, featuring the world’s highest railway arch bridge over the Chenab River, was integrated into the national network in 2025.
Step 3: Conclusion.
The correct answer is (E) Namo Bharat RRTS, which was integrated into the national network in 2025.