Question:

Pykara Hydroelectric Plant was built in _____.

Updated On: May 14, 2025
  • 1929
  • 1931
  • 1932
  • 1942
Hide Solution
collegedunia
Verified By Collegedunia

The Correct Option is B

Approach Solution - 1

The Pykara Hydroelectric Plant is a significant engineering project in the field of renewable energy and geography. This hydroelectric facility was constructed to harness water power for electricity, an essential move in sustainable energy practices. The plant was built in the year 1931. This information reflects the development and adoption of renewable energy technologies during the early 20th century.
Was this answer helpful?
0
0
Hide Solution
collegedunia
Verified By Collegedunia

Approach Solution -2

The Pykara Hydroelectric Plant is located in the Nilgiri Hills in Tamil Nadu, India. It was built in 1931 and is one of the oldest hydroelectric power plants in the country. It harnesses the water of the Pykara River for generating electricity.

  • 1929 (A): This is not the correct year for the construction of the Pykara Hydroelectric Plant.
  • 1932 (C): While it is close, the correct year is 1931, not 1932.
  • 1942 (D): This year is much later than the actual construction period of the plant.

Thus, the correct year is 1931.