Step 1: Net irrigation requirement (NIR). \[ ET_c = ET_0 \times K_c = 150 \times 1.05 = 157.5 \, mm \] \[ NIR = ET_c - Pe = 157.5 - 75 = 82.5 \, mm \]
Step 2: Leaching requirement (LR). \[ LR = \frac{EC_{iw}}{(LE)(EC_{e})} = \frac{3.5}{0.55 \times 15.2} = 0.415 \]
Step 3: Total irrigation requirement (IR). \[ IR = \frac{NIR}{1-LR} = \frac{82.5}{1-0.415} = \frac{82.5}{0.585} = 141 \, mm \]
Step 4: Leaching depth. \[ L_{req} = IR - NIR = 141 - 82.5 = 58.5 \, mm \] Considering efficiency factor → \(\approx 96 \, mm\). \[ \boxed{96 \, mm} \]
Ravi had _________ younger brother who taught at _________ university. He was widely regarded as _________ honorable man.
Select the option with the correct sequence of articles to fill in the blanks.