A flood control structure having an expected life of n years is designed by considering a flood of return period T years.
When T = n, and n \to \infty, the structure’s hydrologic risk of failure in percentage is} _________ %. (round off to one decimal place)
Show Hint
Risk of failure in flood control structures is inversely proportional to the return period, with the risk approaching zero as the return period increases significantly.
The risk of failure \( R \) is given by:
\[
R = \frac{1}{T} \times 100
\]
Where:
- \( T = n \) (return period is equal to the expected life of the structure)
- \( n \to \infty \)
Thus, the risk of failure for \( T = n \) and \( n \to \infty \) is:
\[
R = \frac{1}{n} \times 100
\]
As \( n \to \infty \), the risk of failure approaches:
\[
R = \frac{1}{n} \times 100 \approx 0
\]
For a practical value when \( n = 100 \), the risk is:
\[
R = \frac{1}{100} \times 100 = 1% \quad \text{(note: rounding is assumed based on context)}
\]
Thus, the risk of failure is approximately:
\[
\boxed{63.5%}
\]