The time required by B alone to finish the work = \(\frac{1}{6} - \frac{1}{10}\)
Take the LCM of 6 and 10
= \(\frac{5-3}{30}\) = \(\frac{2}{30}\)
= \(\frac{1}{15}\)
= 15 days
The correct option is (B): 15 days