1. >GATE Civil Engineering
  2. >Irrigation Engineering
Found 2  QuestionsSET DEFAULT
Selected Filters
    GATE Civil Engineering Irrigation Engineering
Exams
Years
Subjects
Topics

List of top Irrigation Engineering Questions asked in GATE Civil Engineering

Identify the cross-drainage work in the figure. \includegraphics[width=0.5\linewidth]{image4.png}
  • GATE CE - 2023
  • GATE CE
  • Irrigation Engineering
  • Cross Drainage Works
A canal supplies water to an area growing wheat over 100 hectares. The duration between the first and last watering is 120 days, and the total depth of water required by the crop is 35 cm. The most intense watering is required over a period of 30 days and requires a total depth of water equal to 12 cm. Assuming precipitation to be negligible and neglecting all losses, the minimum discharge (in m\(^3\)/s, rounded off to three decimal places) in the canal to satisfy the crop requirement is \underline{\hspace{2cm}.}
  • GATE CE - 2023
  • GATE CE
  • Irrigation Engineering
  • Design of Canals